salman-02

Also 3.5m height one side climbing formwork with some kind of brackets type.

Designing of super structure for shuttering of flip bucket spillway.

Climbing system formed all and side walls spillway shut.

Contractor: Paymab Company

Consultant: Mahab Ghods Company

In order to implement the body of Salman Farsi dual-arched concrete dam (Ghir and Karezin), located in south of Shiraz, with 125 metres height and 345 metres top length, Boozarjomehr Industrial Group designed and manufactured elevating formwork systems which were compatible with the huge amount of pouring concrete for the dam body blocks, with a height of 3/5 metre in which it considerably helped operating the project by its outstanding ease of usage. These formworks were also used in the spillway side walls parts.