TecomDubai-UAE-2

(2B+G+16F+POOL+Terrace Residential), Building that all BFS – SK slab system designed, built and delivered by BFS Dubai office and its Jebel Ali Factory.

In order to operate the flat slabs of the lower grounds,the ceiling mantling system BFS-SK with plywood shuttering covering was used in which it was designed, built and delivered by BFS Dubai Office at its Jebel Ali Factory for an estimated 1000 Square meter ceiling and a slab-thickness of 325 millimeters. Taking the crucial timing table of this project into consideration, the use of this system considerably helped saving time in the completion of the project and decreased mantling expenditures and labors.